Sign In | Join Free | My jazzonln.com
jazzonln.com
Products
Search by Category
Home > Boilers >

Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

    Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

    Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure

    Description


    The boiler headers have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium. From the structure, it can be classified as the end cover type (end closure) and necking down type.
    The critical point to manufacture the end cover is the welding process. We adopt the advanced manufacture process, the complete large size device and mature technology. Especially the welding of the end cover with the header, we adopt the auto submerged welding, this welding method is featured with high manufacturing efficiency, good quality, artistic appearance and safe and reliable operation.

    Certificates

    1. ISO 9001 certificate

    2. ISO 14001 certificate

    3. ASME standard

    4. TUV & BV certified supplier

    FAQ

    1. Why choose us?

    We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

    We ensure the deliver time, high quality, and the best after-sale service for you.

    2. How to order?
    Welcome come to our factory for inspecting and discussion the technical details.
    Contact Information

    ADD: No.1,Dong Li Road, Dong Lai, Zhangjiagang City, Jiangsu, China

    Phone:+86 0512-56770166

    E-mail: orl@orlpower.com

    Website: www.boiler-units.com



    Name&TypeSupply Ability:FOB Price
    Boiler drum100Ton/Tons per MonthContact Me Get Latest Price
    Boiler header100Ton/Tons per MonthContact Me Get Latest Price
    Boiler waterwall panel500Ton/Tons per MonthContact Me Get Latest Price
    Boiler economizer500Ton/Tons per MonthContact Me Get Latest Price
    Boiler super heater300Ton/Tons per MonthContact Me Get Latest Price
    Boiler air preheater300Ton/Tons per MonthContact Me Get Latest Price
    Other
    Quality Low Pressure Steel Electric CFB Boiler Header Boiler Steam Header Water Tube Structure for sale
    Send your message to this supplier
     
    From:
    Enter your email please.
    To: mainevillemotors limited
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0